Scroll
3.5 Acres
Leasehold
On Application
Commercial Land Grindley Business Village, Stafford , Staffordshire, ST18 0LR
This exceptional commercial opportunity comprises three well-defined plots of brownfield land, strategically positioned adjacent to the well-established Grindley Business Village. Previously home to an anaerobic digestion power plant (now fully decommissioned and removed), the site benefits from excellent accessibility and a high-capacity gas-fed electricity supply. The site features an existing high-capacity gas infrastructure, capable of delivering 80 to 100 m per hour, generating an electricity output of approximately 800 KWh. With five and a half times more energy transmitted through the UK's gas infrastructure than its electricity network, this location is primed to support energy-intensive commercial operations. The planned integration of hydrogen into the national gas supply by 2025, in line with the UK's net-zero targets, further enhances the site's long-term energy potential. With the increasing national demand for EV fleet charging and commercial battery distribution, this site presents an unparalleled opportunity for businesses looking to be a key player in the UK's evolving energy landscape. The site is well-suited for operations requiring a constant, high-power supply, such as EV fleet charging hubs or commercial battery charging and distribution facilities. Ideally suited for energy-intensive operations, offering flexibility for other alternative industrial and commercial uses.This exceptional commercial opportunity comprises three well-defined plots of brownfield land, strategically positioned adjacent to the well-established Grindley Business Village. Previously home to an anaerobic digestion power plant (now fully decommissioned and removed), the site benefits from excellent accessibility and a high-capacity gas-fed electricity supply. The site features an existing high-capacity gas infrastructure, capable of delivering 80 to 100 m per hour, generating an electricity output of approximately 800 KWh. With five and a half times more energy transmitted through the UK's gas infrastructure than its electricity network, this location is primed to support energy-intensive commercial operations. The planned integration of hydrogen into the national gas supply by 2025, in line with the UK's net-zero targets, further enhances the site's long-term energy potential. With the increasing national demand for EV fleet charging and commercial battery distribution, this site presents an unparalleled opportunity for businesses looking to be a key player in the UK's evolving energy landscape. The site is well-suited for operations requiring a constant, high-power supply, such as EV fleet charging hubs or commercial battery charging and distribution facilities. Ideally suited for energy-intensive operations, offering flexibility for other alternative industrial and commercial uses.